Construction
Build what each buyer was promised
Compares every new drawing with the specification each buyer signed, and tells you where the two no longer agree while it can still be fixed on paper.
Works with
- SharePoint or Google Drive
- Your sales records
- monday.com
Using something else? It can usually work with the tools you already have. We check yours on the call.
The problem
The buyer signed a specification months ago. Since then the drawings have changed a dozen times, and nobody rereads every signed specification after each change. The gap shows up at handover.
How it works
- 01
A consultant uploads a revised drawing.
- 02
It compares the change with the specification every affected buyer signed, and with the sales plans.
- 03
Each mismatch is one line: which homes, which clause, which sheet. The project manager decides whether the drawing or the promise changes.
You decide what it does on its own and what waits for your OK. You can change that, or pause it, at any time.
What changes for you
A bathtub that became a shower is found three weeks before the pipes go in, not on the day the buyer gets the keys.
Want this off your plate?
On a free call we look at how you do this today, and show you what an agent would take over. If it needs to work a little differently for your business, we build it that way.