The Library of Work

Construction

Catch drawing clashes before they reach site

Lays each new drawing over the others for the same floor, finds where a duct meets a beam or a wall has moved, and gives every clash an owner and a date.

Or find an agent yourself

Works with

  • SharePoint or Google Drive
  • Outlook
  • monday.com

Using something else? It can usually work with the tools you already have. We check yours on the call.

The problem

Every consultant updates their own drawings on their own schedule. Nobody lays them over each other, so the duct that runs through a beam is found by the crew standing under it.

How it works

  1. 01

    A consultant uploads a new drawing to the project folder, as they do today.

  2. 02

    It lays the drawing over the others for that floor and lists each place they no longer fit, with the two sheets side by side.

  3. 03

    Each clash goes on one list with the consultant who owns it and a date, and the note to them waits for the project manager to approve.

You decide what it does on its own and what waits for your OK. You can change that, or pause it, at any time.

What changes for you

Clashes are settled on paper, where they cost an email, not on site, where they cost a crew and a week.

Want this off your plate?

On a free call we look at how you do this today, and show you what an agent would take over. If it needs to work a little differently for your business, we build it that way.

Or find an agent yourself

More ideas like this

The whole library
Chloe
Chloe
Tell me what you need
Chloe
Hey, I'm Chloe. What's on your plate that you'd love to hand off?